Results 1 to 6 of 6

Thread: Turn around for saftey very slow!!

  1. #1
    Join Date
    Aug 2003
    Location
    Friendswood, TX
    Posts
    436

    Post

    Sorry to hear about your bad luck. Like someone said above, i got mine back within the week.
    • 28" SBE Dipped in Max4 by Tim Newbold, SureCycle Action & Magazine Upgrade Kit, X-coil Sporting Pad
    • 28" SBE2 w/ SureCycle Magazine Upgrade, Briley bolt handle
    • 18" SuperNova Tactical w/Pistol Grip Ghost-Ring Meprolight Night Sights, TacStar SideSaddle, TacStar Magazine Extension, Flashlight mount underneath barrel, SureCycle Magazine Upgrade
    • 28" Cordoba 20 gauge with Briley bolt handle

  2. #2
    Join Date
    Jun 2004
    Location
    Alamogordo New Mexico
    Posts
    3

    Post

    I sent my trigger assy. to Benelli. Benelli got it Monday 7/19. I called them to find out about it and they told me they did not get it. After telling them who signed for it they found it in a room. Got a note in the mail from them today saying it will take 15 working days from 7/26!!! Just a wee bit longer then a two day turn around. This is my first Benelli and most likley my last.

  3. #3
    Join Date
    Jun 2004
    Location
    Harvest Al
    Posts
    54

    Post

    Sorry to hear of your trouble. I sent mine in on a Monday and got it back the next Friday. I thought that was very fast.

  4. #4
    Join Date
    Jul 2004
    Location
    North Florida
    Posts
    50

    Post

    New Mexico, before you give upon Benelli send a copy of this note to....[email protected].she is coordinating the safety spring replacement. I am getting excellent service.

  5. #5
    Join Date
    Jun 2004
    Location
    Alamogordo New Mexico
    Posts
    3

    Post

    Originally posted by LBDB1A:
    New Mexico, before you give upon Benelli send a copy of this note to....[email protected].she is coordinating the safety spring replacement. I am getting excellent service.
    I'm sure she is who I talked to!!!

  6. #6
    Join Date
    May 2004
    Location
    Tennessee
    Posts
    199

    Post

    NewMexico,

    A friend of mine sent his M1 in for repairs. Like you, he got a notice from Benelli in the mail that the time of his repairs was going to be X days.

    The funny thing is, the same day he got he note from Benelli regarding it was going to be X days for the repair, he had an UPS attempted shipping notice on his door.

    Yep. It was his M1 already returned from Benelli.

    I guess Benelli is giving the worst case scenario.

    My trigger spring replacement was very quick. Benelli got my trigger assembly on Wednesday and I would have got the assembly back on Friday except my fault for providing my home zip code to my work address.

Similar Threads

  1. M2, slow action in cold weather?
    By Wirenut in forum Benelli
    Replies: 18
    Last Post: 12-23-2009, 12:17 AM
  2. repair turn around time
    By willpond in forum Stoeger Firearms
    Replies: 8
    Last Post: 08-15-2005, 10:14 PM
  3. Are caps interfering with cylinder turn?
    By thebeeth in forum Uberti
    Replies: 6
    Last Post: 02-05-2005, 10:46 PM
  4. SBE II safety turn-around as promised
    By fowlpete in forum Benelli
    Replies: 2
    Last Post: 07-16-2004, 07:53 PM
  5. Super 90 Slow Bolt
    By lawaterfowler in forum Benelli
    Replies: 1
    Last Post: 02-04-2004, 10:21 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •